| Stn | Name | Date (PDT) | Event | Comment |
|---|---|---|---|---|
| 142 | SAN FRANCISCO BAR, CA | 2013-06-19 | Other | Buoy relocated. |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2013-06-19 | Buoy offsite | - |
| 096 | DANA POINT, CA | 2013-05-26 | Shore station failure | Powermate dead, system powered down due to noise. |
| 076 | DIABLO CANYON, CA | 2013-05-13 | Shore station failure | Acquisition computer dead. |
| 192 | OREGON INLET, NC | 2013-05-12 | Data acquisition failure | Communications lost. |
| 433 | DUCK FRF 17m, NC | 2013-05-09 | Deployed buoy | - |
| 121 | IPAN, GUAM | 2013-04-30 | Replaced buoy | - |
| 195 | LA PEROUSE BANK, CANADA | 2013-04-29 | Station decommissioned | - |
| 195 | LA PEROUSE BANK, CANADA | 2013-04-28 | Recovered buoy | - |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2013-04-26 | Other | Wave sensor down for maintenance. |
| 106 | WAIMEA BAY, HI | 2013-04-26 | Buoy offsite | - |
| 067 | SAN NICOLAS ISLAND, CA | 2013-04-19 | Replaced buoy | - |
| 094 | CAPE MENDOCINO, CA | 2013-04-03 | Replaced buoy | - |
| 128 | HUMBOLDT BAY SOUTH SPIT, CA | 2013-04-03 | Recovered buoy | - |
| 128 | HUMBOLDT BAY SOUTH SPIT, CA | 2013-04-03 | Station decommissioned | - |
| 201 | SCRIPPS NEARSHORE, CA | 2013-03-27 | Deployed buoy | - |
| 100 | TORREY PINES OUTER, CA | 2013-03-27 | Other | Buoy checked for growth briefly after 1900 UTC. |
| 181 | RINCON, PUERTO RICO | 2013-03-21 | Deployed buoy | - |
| 142 | SAN FRANCISCO BAR, CA | 2013-03-19 | Deployed buoy | - |
| 146 | KAUMALAPAU, LANAI, HI | 2013-03-19 | Other | Replaced mooring. |
| 187 | PAUWELA, MAUI, HI | 2013-03-13 | Deployed buoy | - |
| 181 | RINCON, PUERTO RICO | 2013-03-08 | Buoy offsite | - |
| 142 | SAN FRANCISCO BAR, CA | 2013-02-22 | Buoy offsite | - |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2013-02-19 | Other | Pressure sensor down for maintenance. |
| 167 | SAN NICOLAS ISLAND NORTH, CA | 2013-02-17 | Battery problems | Batteries fully depleted on the 20th. |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2013-02-16 | Data acquisition failure | Shore station down. |
| 179 | ASTORIA CANYON, OR | 2013-02-13 | Deployed buoy | - |
| 163 | KALO, MAJURO, MARSHALL ISLANDS | 2013-02-11 | Buoy offsite | - |
| 187 | PAUWELA, MAUI, HI | 2013-02-10 | Buoy offsite | - |
| 106 | WAIMEA BAY, HI | 2013-02-09 | Replaced buoy | - |
| 200 | WILMINGTON HARBOR, NC | 2013-02-06 | Deployed buoy | - |
| 106 | WAIMEA BAY, HI | 2013-01-29 | Data acquisition failure | Data transmissions from buoy stopped. |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2013-01-28 | Other | Wind sensor back on line |
| 150 | MASONBORO INLET, ILM2, NC | 2013-01-15 | Deployed buoy | - |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2013-01-15 | Other | Station down for maintenance. |
| 150 | MASONBORO INLET, ILM2, NC | 2013-01-14 | Recovered buoy | - |
| 076 | DIABLO CANYON, CA | 2013-01-09 | Replaced buoy | - |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2013-01-07 | Gauge failure | Pressure sensor failure. |
| 093 | MISSION BAY OFFSHORE, CA | 2013-01-05 | Station decommissioned | - |
| 093 | MISSION BAY OFFSHORE, CA | 2013-01-04 | Buoy offsite | Recovered. |
| 142 | SAN FRANCISCO BAR, CA | 2013-01-04 | Deployed buoy | - |
| 175 | CENTRAL COOK INLET, AK | 2013-01-03 | Buoy offsite | Recovered 01-04. |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2012-12-19 | Replaced buoy | - |
| 179 | ASTORIA CANYON, OR | 2012-12-18 | Buoy offsite | Recovered 12-23. |
| 142 | SAN FRANCISCO BAR, CA | 2012-12-18 | Buoy offsite | - |
| 067 | SAN NICOLAS ISLAND, CA | 2012-12-13 | Gauge failure | Bad low-frequency data and power issues. |
| 430 | DUCK FRF 26m, NC | 2012-12-04 | Replaced buoy | - |
| 147 | CAPE HENRY, VA | 2012-11-27 | Replaced buoy | - |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2012-11-27 | Deployed buoy | - |
| 180 | SAN FRANCISCO OFFSHORE, CA | 2012-11-20 | Station decommissioned | - |
| 180 | SAN FRANCISCO OFFSHORE, CA | 2012-11-19 | Recovered buoy | Temporary replacement for NDBC 46026. Will not be re-deployed. |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2012-11-19 | Recovered buoy | - |
| 180 | SAN FRANCISCO OFFSHORE, CA | 2012-11-18 | Buoy offsite | - |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2012-11-16 | Battery problems | Single battery failed causing transmission problems. |
| 191 | POINT LOMA SOUTH, CA | 2012-11-15 | Other | Swapped out hatchcover due to Iridium transmission problems. |
| 150 | MASONBORO INLET, ILM2, NC | 2012-11-09 | Deployed buoy | - |
| 150 | MASONBORO INLET, ILM2, NC | 2012-11-02 | Recovered buoy | - |
| 185 | MONTEREY BAY WEST, CA | 2012-11-01 | Recovered buoy | - |
| 146 | KAUMALAPAU, LANAI, HI | 2012-10-30 | Replaced buoy | Recovered temporarily, batteries replaced. |
| 198 | KANEOHE BAY, HI | 2012-10-26 | Deployed buoy | - |
| 139 | UMPQUA OFFSHORE, OR | 2012-10-25 | Replaced buoy | - |
| 197 | TANAPAG, SAIPAN, NMI | 2012-10-24 | Deployed buoy | - |
| 191 | POINT LOMA SOUTH, CA | 2012-10-23 | Deployed buoy | - |
| 196 | RITIDIAN POINT, GUAM | 2012-10-20 | Deployed buoy | - |
| 111 | ANACAPA PASSAGE, CA | 2012-10-16 | Deployed buoy | - |
| 191 | POINT LOMA SOUTH, CA | 2012-10-13 | Buoy offsite | Recovered. |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2012-10-12 | Replaced buoy | - |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2012-10-08 | Battery problems | Signal from buoy lost, batteries dead. |
| 154 | BLOCK ISLAND, RI | 2012-10-05 | Replaced buoy | - |
| 166 | OCEAN STATION PAPA | 2012-10-04 | Replaced buoy | - |
| 182 | SANTA CRUZ ISLAND SOUTH, CA | 2012-10-04 | Recovered buoy | - |
| 182 | SANTA CRUZ ISLAND SOUTH, CA | 2012-09-30 | Gauge failure | Iridium communications lost. |
| 175 | CENTRAL COOK INLET, AK | 2012-09-27 | Deployed buoy | - |
| 067 | SAN NICOLAS ISLAND, CA | 2012-09-22 | Deployed buoy | - |
| 166 | OCEAN STATION PAPA | 2012-09-21 | Battery problems | Iridium communications lost. |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2012-09-19 | Other | Replaced pressure sensor used for wave measurement. |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2012-09-17 | Other | Station down for maintenance. |
| 180 | SAN FRANCISCO OFFSHORE, CA | 2012-09-13 | Replaced buoy | - |
| 142 | SAN FRANCISCO BAR, CA | 2012-09-13 | Deployed buoy | - |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2012-09-11 | Replaced buoy | - |
| 132 | FERNANDINA BEACH, FL | 2012-09-08 | Replaced buoy | - |
| 134 | FORT PIERCE, FL | 2012-09-06 | Replaced buoy | - |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2012-09-05 | Gauge failure | Wave data bad, low readings since July 2012; wave data made non-public. |
| 163 | KALO, MAJURO, MARSHALL ISLANDS | 2012-09-05 | Deployed buoy | - |
| 144 | ST. PETERSBURG OFFSHORE, FL | 2012-09-04 | Replaced buoy | - |
| 111 | ANACAPA PASSAGE, CA | 2012-08-25 | Buoy offsite | Recovered |
| 028 | SANTA MONICA BAY, CA | 2012-08-24 | Deployed buoy | - |
| 098 | MOKAPU POINT, HI | 2012-08-23 | Deployed buoy | - |
| 179 | ASTORIA CANYON, OR | 2012-08-21 | Replaced buoy | - |
| 181 | RINCON, PUERTO RICO | 2012-08-17 | Deployed buoy | - |
| 028 | SANTA MONICA BAY, CA | 2012-08-17 | Buoy offsite | Recovered |
| 142 | SAN FRANCISCO BAR, CA | 2012-08-15 | Recovered buoy | - |
| 142 | SAN FRANCISCO BAR, CA | 2012-08-14 | Buoy offsite | - |
| 158 | CABRILLO POINT NEARSHORE, CA | 2012-07-31 | Replaced buoy | - |
| 161 | SAN ELIJO NEARSHORE, CA | 2012-07-31 | Recovered buoy | - |
| 161 | SAN ELIJO NEARSHORE, CA | 2012-07-31 | Station decommissioned | Primarily used for model validation hence a short deployment |
| 430 | DUCK FRF 26m, NC | 2012-07-27 | Gauge failure | Intermittent bad data, made non-public. |
| 142 | SAN FRANCISCO BAR, CA | 2012-07-26 | Deployed buoy | - |
| 175 | CENTRAL COOK INLET, AK | 2012-07-25 | Recovered buoy | - |
| 175 | CENTRAL COOK INLET, AK | 2012-07-24 | Buoy offsite | - |
| 098 | MOKAPU POINT, HI | 2012-07-21 | Recovered buoy | - |
| 071 | HARVEST, CA | 2012-07-18 | Deployed buoy | - |
| 142 | SAN FRANCISCO BAR, CA | 2012-07-17 | Buoy offsite | - |
| 181 | RINCON, PUERTO RICO | 2012-07-13 | Recovered buoy | - |
| 158 | CABRILLO POINT NEARSHORE, CA | 2012-07-06 | Gauge failure | Bad wave data, made non-public. |
| 162 | CLATSOP SPIT, OR | 2012-06-29 | Deployed buoy | - |
| 093 | MISSION BAY OFFSHORE, CA | 2012-06-27 | Deployed buoy | - |
| 162 | CLATSOP SPIT, OR | 2012-06-27 | Buoy offsite | Recovered. |
| 093 | MISSION BAY OFFSHORE, CA | 2012-06-25 | Buoy offsite | Recovered. |
| 157 | POINT SUR, CA | 2012-06-12 | Deployed buoy | - |
| 093 | MISSION BAY OFFSHORE, CA | 2012-06-12 | Antenna problems | Found antenna broken in half. Replaced antenna. |
| 067 | SAN NICOLAS ISLAND, CA | 2012-06-12 | Recovered buoy | - |
| 067 | SAN NICOLAS ISLAND, CA | 2012-06-02 | Data acquisition failure | Iridium communications problem |
| 168 | HUMBOLDT BAY NORTH SPIT, CA | 2012-05-31 | Deployed buoy | - |
| 158 | CABRILLO POINT NEARSHORE, CA | 2012-05-31 | Replaced buoy | - |
| 176 | HALIFAX HARBOR, CANADA | 2012-05-28 | Recovered buoy | - |
| 157 | POINT SUR, CA | 2012-05-26 | Buoy offsite | Recovered 05-27 |
| 430 | DUCK FRF 26m, NC | 2012-05-23 | Deployed buoy | - |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2012-05-04 | Deployed buoy | Same mooring |
| 175 | CENTRAL COOK INLET, AK | 2012-05-03 | Deployed buoy | - |
| 168 | HUMBOLDT BAY NORTH SPIT, CA | 2012-05-02 | Buoy offsite | Recovered 5-4. |
| 195 | LA PEROUSE BANK, CANADA | 2012-04-30 | Deployed buoy | - |
| 165 | BARBERS POINT, HI | 2012-04-27 | Deployed buoy | - |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2012-04-24 | Recovered buoy | - |
| 036 | GRAYS HARBOR, WA | 2012-04-24 | Deployed buoy | - |
| 036 | GRAYS HARBOR, WA | 2012-04-23 | Recovered buoy | Low Batteries. |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2012-04-20 | Gauge failure | Buoy hit, data made non-public. |
| 190 | NEW RIVER INLET, NC | 2012-04-14 | Deployed buoy | - |
| 192 | OREGON INLET, NC | 2012-04-08 | Deployed buoy | - |
| 168 | HUMBOLDT BAY NORTH SPIT, CA | 2012-04-07 | Deployed buoy | - |
| 186 | CAPE CHARLES, VA | 2012-04-03 | Deployed buoy | - |
| 142 | SAN FRANCISCO BAR, CA | 2012-04-03 | Deployed buoy | Recovered and re-deployed at sea. |
| 142 | SAN FRANCISCO BAR, CA | 2012-04-01 | Buoy offsite | - |
| 430 | DUCK FRF 26m, NC | 2012-03-25 | Buoy offsite | - |
| 029 | POINT REYES, CA | 2012-03-20 | Deployed buoy | - |
| 160 | JEFFREYS LEDGE, NH | 2012-03-16 | Deployed buoy | - |
| 093 | MISSION BAY OFFSHORE, CA | 2012-03-15 | Deployed buoy | - |
| 430 | DUCK FRF 26m, NC | 2012-03-14 | Replaced buoy | - |
| 150 | MASONBORO INLET, ILM2, NC | 2012-03-13 | Deployed buoy | - |
| 093 | MISSION BAY OFFSHORE, CA | 2012-03-10 | Buoy offsite | - |
| 096 | DANA POINT, CA | 2012-03-09 | Replaced buoy | - |
| 430 | DUCK FRF 26m, NC | 2012-03-06 | Battery problems | Batteries depleted. |
| 188 | HILO, HAWAII, HI | 2012-03-04 | Deployed buoy | - |
| 186 | CAPE CHARLES, VA | 2012-03-03 | Buoy offsite | Recovered 3-5. |
| 160 | JEFFREYS LEDGE, NH | 2012-03-01 | Recovered buoy | - |
| 150 | MASONBORO INLET, ILM2, NC | 2012-02-27 | Buoy offsite | - |
| 186 | CAPE CHARLES, VA | 2012-02-23 | Deployed buoy | - |
| 160 | JEFFREYS LEDGE, NH | 2012-02-17 | Battery problems | Batteries dead. |
| 045 | OCEANSIDE OFFSHORE, CA | 2012-02-13 | Replaced buoy | - |
| 168 | HUMBOLDT BAY NORTH SPIT, CA | 2012-02-12 | Buoy offsite | - |
| 045 | OCEANSIDE OFFSHORE, CA | 2012-02-11 | Battery problems | Batteries depleted. |
| 165 | BARBERS POINT, HI | 2012-02-11 | Buoy offsite | - |
| 100 | TORREY PINES OUTER, CA | 2012-02-06 | Replaced buoy | - |
| 191 | POINT LOMA SOUTH, CA | 2012-01-31 | Deployed buoy | - |
| 191 | POINT LOMA SOUTH, CA | 2012-01-24 | Buoy offsite | Recovered. |
| 093 | MISSION BAY OFFSHORE, CA | 2012-01-18 | Replaced buoy | - |
| 156 | MONTEREY CANYON OUTER, CA | 2012-01-13 | Replaced buoy | - |
| 107 | GOLETA POINT, CA | 2012-01-10 | Replaced buoy | - |
| 107 | GOLETA POINT, CA | 2012-01-08 | Gauge failure | - |
| 106 | WAIMEA BAY, HI | 2012-01-06 | Replaced buoy | Low batteries. |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2011-12-08 | Replaced buoy | - |
| 100 | TORREY PINES OUTER, CA | 2011-12-06 | Other | Hull of buoy cleaned around 1800 UTC. |
| 187 | PAUWELA, MAUI, HI | 2011-12-03 | Deployed buoy | - |
| 154 | BLOCK ISLAND, RI | 2011-11-21 | Deployed buoy | - |
| 139 | UMPQUA OFFSHORE, OR | 2011-11-20 | Deployed buoy | - |
| 093 | MISSION BAY OFFSHORE, CA | 2011-11-09 | Deployed buoy | - |
| 092 | SAN PEDRO, CA | 2011-11-04 | Replaced buoy | - |
| 093 | MISSION BAY OFFSHORE, CA | 2011-11-03 | Buoy offsite | - |
| 139 | UMPQUA OFFSHORE, OR | 2011-10-30 | Buoy offsite | - |
| 168 | HUMBOLDT BAY NORTH SPIT, CA | 2011-10-19 | Replaced buoy | - |
| 094 | CAPE MENDOCINO, CA | 2011-10-18 | Replaced buoy | - |
| 128 | HUMBOLDT BAY SOUTH SPIT, CA | 2011-10-18 | Replaced buoy | - |
| 154 | BLOCK ISLAND, RI | 2011-10-16 | Buoy offsite | - |
| 175 | CENTRAL COOK INLET, AK | 2011-10-12 | Buoy offsite | - |
| 142 | SAN FRANCISCO BAR, CA | 2011-10-08 | Deployed buoy | - |
| 176 | HALIFAX HARBOR, CANADA | 2011-10-04 | Deployed buoy | - |
| 174 | SOUTH HECATE STRAIT, CANADA | 2011-10-04 | Battery problems | Batteries depleted. |
| 142 | SAN FRANCISCO BAR, CA | 2011-10-02 | Buoy offsite | Shana Rae picked up the buoy. |
| 185 | MONTEREY BAY WEST, CA | 2011-09-27 | Deployed buoy | - |
| 176 | HALIFAX HARBOR, CANADA | 2011-09-23 | Recovered buoy | - |
| 107 | GOLETA POINT, CA | 2011-09-21 | Deployed buoy | - |
| 167 | SAN NICOLAS ISLAND NORTH, CA | 2011-09-14 | Deployed buoy | - |
| 184 | POINT MUGU OFFSHORE, CA | 2011-09-14 | Station decommissioned | - |
| 067 | SAN NICOLAS ISLAND, CA | 2011-09-14 | Replaced buoy | - |
| 184 | POINT MUGU OFFSHORE, CA | 2011-09-13 | Recovered buoy | - |
| 107 | GOLETA POINT, CA | 2011-09-10 | Buoy offsite | - |
| 163 | KALO, MAJURO, MARSHALL ISLANDS | 2011-09-09 | Buoy offsite | - |
| 147 | CAPE HENRY, VA | 2011-09-02 | Deployed buoy | - |
| 175 | CENTRAL COOK INLET, AK | 2011-09-02 | Other | Between 1105 and 1405 UTC the anchor appears to have moved several hundred feet north. |
| 147 | CAPE HENRY, VA | 2011-08-21 | Buoy offsite | Recovered 8-22. |
| 121 | IPAN, GUAM | 2011-08-21 | Replaced buoy | - |
| 147 | CAPE HENRY, VA | 2011-08-17 | Deployed buoy | New target location is 36 54.912N 075 43.205W in 60 feet of water |
| 132 | FERNANDINA BEACH, FL | 2011-08-04 | Deployed buoy | - |
| 142 | SAN FRANCISCO BAR, CA | 2011-08-03 | Deployed buoy | - |
| 132 | FERNANDINA BEACH, FL | 2011-08-01 | Buoy offsite | - |
| 142 | SAN FRANCISCO BAR, CA | 2011-07-27 | Buoy offsite | - |
| 147 | CAPE HENRY, VA | 2011-07-22 | Recovered buoy | - |
| 028 | SANTA MONICA BAY, CA | 2011-07-21 | Replaced buoy | - |
| 111 | ANACAPA PASSAGE, CA | 2011-07-21 | Replaced buoy | - |
| 093 | MISSION BAY OFFSHORE, CA | 2011-07-19 | Other | Replaced tophat |
| 067 | SAN NICOLAS ISLAND, CA | 2011-07-13 | Power outage | - |
| 184 | POINT MUGU OFFSHORE, CA | 2011-07-11 | Deployed buoy | - |
| 045 | OCEANSIDE OFFSHORE, CA | 2011-07-08 | Deployed buoy | - |
| 076 | DIABLO CANYON, CA | 2011-07-07 | Other | Shore station moved to new location |
| 093 | MISSION BAY OFFSHORE, CA | 2011-07-01 | Deployed buoy | - |
| 181 | RINCON, PUERTO RICO | 2011-06-15 | Gauge failure | Temperature sensor flagged bad. |
| 157 | POINT SUR, CA | 2011-06-14 | Deployed buoy | - |
| 139 | UMPQUA OFFSHORE, OR | 2011-06-10 | Deployed buoy | - |
| 182 | SANTA CRUZ ISLAND SOUTH, CA | 2011-06-09 | Deployed buoy | - |
| 134 | FORT PIERCE, FL | 2011-06-06 | Deployed buoy | - |
| 157 | POINT SUR, CA | 2011-05-29 | Buoy offsite | Recovered 6-6. |
| 161 | SAN ELIJO NEARSHORE, CA | 2011-05-27 | Replaced buoy | - |
| 134 | FORT PIERCE, FL | 2011-05-26 | Buoy offsite | - |
| 156 | MONTEREY CANYON OUTER, CA | 2011-05-25 | Other | Growth cleaned off of hull and upper mooring of buoy. |
| 139 | UMPQUA OFFSHORE, OR | 2011-05-23 | Buoy offsite | - |
| 176 | HALIFAX HARBOR, CANADA | 2011-05-20 | Deployed buoy | - |
| 163 | KALO, MAJURO, MARSHALL ISLANDS | 2011-05-18 | Replaced buoy | - |
| 170 | SOUTH RAMEA ISLAND, CANADA | 2011-05-13 | Recovered buoy | - |
| 191 | POINT LOMA SOUTH, CA | 2011-05-13 | Data acquisition failure | Shore station down. |
| 147 | CAPE HENRY, VA | 2011-05-09 | Replaced buoy | - |
| 175 | CENTRAL COOK INLET, AK | 2011-05-09 | Deployed buoy | - |
| 167 | SAN NICOLAS ISLAND NORTH, CA | 2011-05-06 | Buoy offsite | - |
| 181 | RINCON, PUERTO RICO | 2011-04-29 | Deployed buoy | - |
| 146 | KAUMALAPAU, LANAI, HI | 2011-04-25 | Deployed buoy | - |
| 150 | MASONBORO INLET, ILM2, NC | 2011-04-20 | Replaced buoy | - |
| 092 | SAN PEDRO, CA | 2011-04-20 | Deployed buoy | - |
| 092 | SAN PEDRO, CA | 2011-04-14 | Buoy offsite | Recovered. |
| 432 | FAREHAM, ST. CROIX, VI | 2011-04-13 | Buoy offsite | Recovered. |
| 162 | CLATSOP SPIT, OR | 2011-04-08 | Deployed buoy | - |
| 179 | ASTORIA CANYON, OR | 2011-04-08 | Deployed buoy | - |
| 191 | POINT LOMA SOUTH, CA | 2011-04-01 | Deployed buoy | |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2011-03-30 | Deployed buoy | - |
| 150 | MASONBORO INLET, ILM2, NC | 2011-03-30 | Recovered buoy | - |
| 144 | ST. PETERSBURG OFFSHORE, FL | 2011-03-29 | Replaced buoy | - |
| 150 | MASONBORO INLET, ILM2, NC | 2011-03-29 | Battery problems | Signal lost, batteries depleted. |
| 146 | KAUMALAPAU, LANAI, HI | 2011-03-22 | Buoy offsite | Recovered |
| 191 | POINT LOMA SOUTH, CA | 2011-03-21 | Buoy offsite | Recovered. |
| 132 | FERNANDINA BEACH, FL | 2011-03-19 | Deployed buoy | - |
| 134 | FORT PIERCE, FL | 2011-03-15 | Deployed buoy | - |
| 177 | LAKE WASHINGTON NORTH, WA | 2011-03-15 | Recovered buoy | - |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2011-03-11 | Other | Strong tsunami signal prevents standard wave processing. |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2011-03-08 | Replaced buoy | Replaced batteries. |
| 132 | FERNANDINA BEACH, FL | 2011-03-04 | Buoy offsite | Recovered 03-05. |
| 154 | BLOCK ISLAND, RI | 2011-03-04 | Replaced buoy | - |
| 132 | FERNANDINA BEACH, FL | 2011-02-27 | Deployed buoy | - |
| 162 | CLATSOP SPIT, OR | 2011-02-21 | Buoy offsite | Recovered. |
| 132 | FERNANDINA BEACH, FL | 2011-02-17 | Buoy offsite | Recovered 2-17. |
| 191 | POINT LOMA SOUTH, CA | 2011-02-15 | Deployed buoy | - |
| 191 | POINT LOMA SOUTH, CA | 2011-02-11 | Recovered buoy | - |
| 180 | SAN FRANCISCO OFFSHORE, CA | 2011-02-10 | Deployed buoy | Temporary replacement for NDBC 46026. |
| 169 | VENTURA NEARSHORE, CA | 2011-02-09 | Station decommissioned | - |
| 169 | VENTURA NEARSHORE, CA | 2011-02-09 | Recovered buoy | - |
| 191 | POINT LOMA SOUTH, CA | 2011-02-09 | Battery problems | Batteries depleted, signal from buoy lost. |
| 134 | FORT PIERCE, FL | 2011-02-02 | Recovered buoy | Iridium transceiver not working. |
| 142 | SAN FRANCISCO BAR, CA | 2011-02-02 | Replaced buoy | Replaced due to bad iridium transceiver. |
| 098 | MOKAPU POINT, HI | 2011-02-01 | Deployed buoy | - |
| 142 | SAN FRANCISCO BAR, CA | 2011-01-12 | Other | Shore station installed to bring in HF data. Iridium still down. |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2010-12-21 | Shore station failure | - |
| 093 | MISSION BAY OFFSHORE, CA | 2010-12-16 | Shore station failure | Warec serial seems to cause shorestation to turnoff. Tried replacing ultra with 2 blades, same issue. |
| 071 | HARVEST, CA | 2010-12-03 | Deployed buoy | - |
| 028 | SANTA MONICA BAY, CA | 2010-12-01 | Replaced buoy | - |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2010-11-29 | Recovered buoy | Buoy tangled in fishing net - bungee cut. |
| 071 | HARVEST, CA | 2010-11-23 | Buoy offsite | - |
| 098 | MOKAPU POINT, HI | 2010-11-23 | Buoy offsite | - |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2010-11-21 | Shore station failure | spacef io error |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2010-11-19 | Deployed buoy | new anchor |
| 177 | LAKE WASHINGTON NORTH, WA | 2010-11-18 | Deployed buoy | - |
| 132 | FERNANDINA BEACH, FL | 2010-11-17 | Deployed buoy | - |
| 096 | DANA POINT, CA | 2010-11-16 | Replaced buoy | - |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2010-11-16 | Other | Replaced mast light nov 16. Other maintenance nov 17. |
| 164 | BARBERS POINT 19NM SW, HI | 2010-11-13 | Station decommissioned | - |
| 164 | BARBERS POINT 19NM SW, HI | 2010-11-08 | Buoy offsite | - |
| 100 | TORREY PINES OUTER, CA | 2010-11-04 | Replaced buoy | - |
| 431 | CHRISTIANSTED, ST CROIX, VI | 2010-11-02 | Station decommissioned | - |
| 431 | CHRISTIANSTED, ST CROIX, VI | 2010-11-02 | Recovered buoy | - |
| 142 | SAN FRANCISCO BAR, CA | 2010-11-02 | Data acquisition failure | Intermittent Iridium dropouts. |
| 154 | BLOCK ISLAND, RI | 2010-11-02 | Gauge failure | Iridium data transmission down. |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2010-10-31 | Buoy offsite | - |
| 132 | FERNANDINA BEACH, FL | 2010-10-23 | Buoy offsite | Recovered. |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2010-10-21 | Replaced buoy | Replaced due to iridium transmission problems. |
| 071 | HARVEST, CA | 2010-10-13 | Replaced buoy | - |
| 165 | BARBERS POINT, HI | 2010-10-11 | Deployed buoy | - |
| 164 | BARBERS POINT 19NM SW, HI | 2010-10-08 | Other | Bad data, buoy motion impaired. Fishing vessels likely involved. |
| 093 | MISSION BAY OFFSHORE, CA | 2010-09-30 | Replaced buoy | - |
| 158 | CABRILLO POINT NEARSHORE, CA | 2010-09-20 | Deployed buoy | swapped batteries on shore and redeployed |
| 191 | POINT LOMA SOUTH, CA | 2010-09-17 | Replaced buoy | - |
| 029 | POINT REYES, CA | 2010-09-13 | Replaced buoy | - |
| 191 | POINT LOMA SOUTH, CA | 2010-09-07 | Replaced buoy | - |
| 191 | POINT LOMA SOUTH, CA | 2010-09-07 | Gauge failure | Bad direction values, data made non-public. |
| 191 | POINT LOMA SOUTH, CA | 2010-09-04 | Battery problems | Batteries depleted, signal from buoy lost. |
| 174 | SOUTH HECATE STRAIT, CANADA | 2010-09-03 | Deployed buoy | - |
| 076 | DIABLO CANYON, CA | 2010-08-25 | Deployed buoy | - |
| 076 | DIABLO CANYON, CA | 2010-08-18 | Recovered buoy | Batteries low. |
| 094 | CAPE MENDOCINO, CA | 2010-08-14 | Deployed buoy | - |
| 261 | SAN ELIJO NEARSHORE DWR-G, CA | 2010-08-04 | Recovered buoy | - |
| 161 | SAN ELIJO NEARSHORE, CA | 2010-07-29 | Replaced buoy | - |
| 261 | SAN ELIJO NEARSHORE DWR-G, CA | 2010-07-29 | Deployed buoy | - |
| 142 | SAN FRANCISCO BAR, CA | 2010-07-18 | Deployed buoy | - |
| 094 | CAPE MENDOCINO, CA | 2010-07-12 | Gauge failure | Data stream lost, iridium and HF stopped transmitting. Buoy lost at sea. |
| 142 | SAN FRANCISCO BAR, CA | 2010-07-10 | Buoy offsite | Recovered by Coast Guard |
| 154 | BLOCK ISLAND, RI | 2010-07-10 | Gauge failure | Bad temperature data, SST taken offline. |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2010-07-08 | Other | System down for maintenance. |
| 121 | IPAN, GUAM | 2010-06-29 | Deployed buoy | - |
| 432 | FAREHAM, ST. CROIX, VI | 2010-06-29 | Deployed buoy | - |
| 156 | MONTEREY CANYON OUTER, CA | 2010-06-24 | Replaced buoy | - |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2010-06-22 | Deployed buoy | - |
| 036 | GRAYS HARBOR, WA | 2010-06-18 | Deployed buoy | - |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2010-06-16 | Deployed buoy | - |
| 166 | OCEAN STATION PAPA | 2010-06-15 | Deployed buoy | - |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2010-06-12 | Buoy offsite | Recovered |
| 170 | SOUTH RAMEA ISLAND, CANADA | 2010-06-11 | Deployed buoy | - |
| 160 | JEFFREYS LEDGE, NH | 2010-06-09 | Deployed buoy | - |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2010-06-07 | Deployed buoy | - |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2010-06-01 | Other | Wave sensor fouled, taken offline. |
| 036 | GRAYS HARBOR, WA | 2010-05-30 | Buoy offsite | Recovered. |
| 093 | MISSION BAY OFFSHORE, CA | 2010-05-28 | Other | Replaced tophat on buoy hull. GPS was not working. |
| 093 | MISSION BAY OFFSHORE, CA | 2010-05-26 | Replaced buoy | - |
| 261 | SAN ELIJO NEARSHORE DWR-G, CA | 2010-05-26 | Recovered buoy | HF transmission problem. Buoy appears undamaged. |
| 430 | DUCK FRF 26m, NC | 2010-05-21 | Deployed buoy | - |
| 430 | DUCK FRF 26m, NC | 2010-05-19 | Recovered buoy | swap out batteries |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2010-05-17 | Recovered buoy | - |
| 121 | IPAN, GUAM | 2010-05-16 | Recovered buoy | - |
| 121 | IPAN, GUAM | 2010-05-15 | Buoy offsite | - |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2010-05-15 | Buoy offsite | Recovered. |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2010-05-15 | Data acquisition failure | Signal from buoy lost. |
| 100 | TORREY PINES OUTER, CA | 2010-05-13 | Replaced buoy | - |
| 261 | SAN ELIJO NEARSHORE DWR-G, CA | 2010-05-12 | Deployed buoy | Colocated with 161 |
| 146 | KAUMALAPAU, LANAI, HI | 2010-05-11 | Deployed buoy | - |
| 067 | SAN NICOLAS ISLAND, CA | 2010-05-06 | Data acquisition failure | Comm link from island down. Issues with the network on the island. |
| 167 | SAN NICOLAS ISLAND NORTH, CA | 2010-05-06 | Data acquisition failure | Network issue on the island. |
| 164 | BARBERS POINT 19NM SW, HI | 2010-05-05 | Replaced buoy | Swapped batteries at sea. |
| 164 | BARBERS POINT 19NM SW, HI | 2010-05-05 | Recovered buoy | - |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2010-05-05 | Other | Wave sensor back online. |
| 160 | JEFFREYS LEDGE, NH | 2010-05-04 | Recovered buoy | - |
| 166 | OCEAN STATION PAPA | 2010-05-03 | Other | Deployed buoy at test location in Puget Sound for 3 days. |
| 160 | JEFFREYS LEDGE, NH | 2010-05-01 | Data acquisition failure | Batteries depleted. |
| 163 | KALO, MAJURO, MARSHALL ISLANDS | 2010-04-23 | Deployed buoy | - |
| 157 | POINT SUR, CA | 2010-04-16 | Replaced buoy | - |
| 147 | CAPE HENRY, VA | 2010-04-07 | Deployed buoy | - |
| 028 | SANTA MONICA BAY, CA | 2010-04-03 | Data acquisition failure | Communication link down. |
| 146 | KAUMALAPAU, LANAI, HI | 2010-04-01 | Buoy offsite | Recovered. |
| 143 | CAPE CANAVERAL NEARSHORE, FL | 2010-04-01 | Data acquisition failure | - |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2010-04-01 | Other | System down for maintenance. |
| 067 | SAN NICOLAS ISLAND, CA | 2010-03-30 | Data acquisition failure | Comm link to island down. |
| 167 | SAN NICOLAS ISLAND NORTH, CA | 2010-03-30 | Data acquisition failure | Comm link to island down. |
| 169 | VENTURA NEARSHORE, CA | 2010-03-25 | Deployed buoy | - |
| 147 | CAPE HENRY, VA | 2010-03-24 | Buoy offsite | Recovered 03-25. |
| 142 | SAN FRANCISCO BAR, CA | 2010-03-11 | Deployed buoy | - |
| 164 | BARBERS POINT 19NM SW, HI | 2010-03-11 | Other | Buoy placed on a six-hour update interval to conserve battery strength. |
| 121 | IPAN, GUAM | 2010-03-10 | Data acquisition failure | Communications with shore station down. |
| 142 | SAN FRANCISCO BAR, CA | 2010-03-02 | Buoy offsite | Recovered 03-04. |
| 106 | WAIMEA BAY, HI | 2010-02-22 | Deployed buoy | - |
| 094 | CAPE MENDOCINO, CA | 2010-02-09 | Deployed buoy | - |
| 128 | HUMBOLDT BAY SOUTH SPIT, CA | 2010-02-08 | Deployed buoy | - |
| 168 | HUMBOLDT BAY NORTH SPIT, CA | 2010-02-08 | Deployed buoy | - |
| 045 | OCEANSIDE OFFSHORE, CA | 2010-02-03 | Replaced buoy | - |
| 098 | MOKAPU POINT, HI | 2010-02-01 | Deployed buoy | - |
| 106 | WAIMEA BAY, HI | 2010-01-30 | Buoy offsite | Recovered. |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2010-01-26 | Deployed buoy | - |
| 128 | HUMBOLDT BAY SOUTH SPIT, CA | 2010-01-21 | Buoy offsite | Recovered. |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2010-01-21 | Recovered buoy | - |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2010-01-20 | Battery problems | Batteries depleted, signal lost. |
| 155 | IMPERIAL BEACH NEARSHORE, CA | 2010-01-14 | Recovered buoy | Buoy found resting on sand near backbeach berm just after morning high tide at Tijuana Soughs north of Tijuana River mouth. Bungee intact. |
| 155 | IMPERIAL BEACH NEARSHORE, CA | 2010-01-14 | Other | Shorestation equipment removed from IB pier lifeguard tower. Antenna and coax cable left attached to lifeguard tower. |
| 155 | IMPERIAL BEACH NEARSHORE, CA | 2010-01-13 | Buoy offsite | - |
| 132 | FERNANDINA BEACH, FL | 2010-01-07 | Replaced buoy | - |
| 096 | DANA POINT, CA | 2010-01-06 | Replaced buoy | Buoy swap. |
| 043 | CAMP PENDLETON NEARSHORE, CA | 2010-01-06 | Other | Buoy recovered to install new board then redeployed. |
| 098 | MOKAPU POINT, HI | 2009-12-30 | Buoy offsite | Recovered. |
| 094 | CAPE MENDOCINO, CA | 2009-12-22 | Buoy offsite | Recovered 12-28. |
| 147 | CAPE HENRY, VA | 2009-12-18 | Deployed buoy | Same location |
| 146 | KAUMALAPAU, LANAI, HI | 2009-12-18 | Deployed buoy | - |
| 155 | IMPERIAL BEACH NEARSHORE, CA | 2009-12-17 | Data acquisition failure | Network down. |
| 147 | CAPE HENRY, VA | 2009-12-04 | Buoy offsite | - |
| 067 | SAN NICOLAS ISLAND, CA | 2009-12-04 | Replaced buoy | - |
| 132 | FERNANDINA BEACH, FL | 2009-12-03 | Gauge failure | Bad data from buoy. |
| 073 | SCRIPPS PIER, LA JOLLA CA | 2009-11-29 | Gauge failure | Pressure sensor conduit pipe damaged. |
| 111 | ANACAPA PASSAGE, CA | 2009-11-17 | Replaced buoy | - |
| 146 | KAUMALAPAU, LANAI, HI | 2009-11-09 | Buoy offsite | Recovered. |
| 431 | CHRISTIANSTED, ST CROIX, VI | 2009-11-05 | Deployed buoy | - |
| 154 | BLOCK ISLAND, RI | 2009-10-21 | Deployed buoy | - |
| 164 | BARBERS POINT 19NM SW, HI | 2009-10-09 | Deployed buoy | - |
| 162 | CLATSOP SPIT, OR | 2009-09-24 | Deployed buoy | - |
| 144 | ST. PETERSBURG OFFSHORE, FL | 2009-09-24 | Replaced buoy | - |
| 098 | MOKAPU POINT, HI | 2009-09-22 | Replaced buoy | - |
| 154 | BLOCK ISLAND, RI | 2009-09-20 | Buoy offsite | - |
| 154 | BLOCK ISLAND, RI | 2009-09-17 | Deployed buoy | Block Island, RI |
| 107 | GOLETA POINT, CA | 2009-09-16 | Deployed buoy | - |
| 107 | GOLETA POINT, CA | 2009-09-08 | Buoy offsite | Bungee cut or failed. |
| 098 | MOKAPU POINT, HI | 2009-09-07 | Data acquisition failure | Signal from buoy lost. |
| 167 | SAN NICOLAS ISLAND NORTH, CA | 2009-09-03 | Replaced buoy | - |
| 106 | WAIMEA BAY, HI | 2009-09-03 | Shore station failure | - |
| 142 | SAN FRANCISCO BAR, CA | 2009-08-23 | Replaced buoy | - |
| 147 | CAPE HENRY, VA | 2009-08-14 | Replaced buoy | - |
| 067 | SAN NICOLAS ISLAND, CA | 2009-08-07 | Power outage | Planned power outage on SNI. |
| 167 | SAN NICOLAS ISLAND NORTH, CA | 2009-08-07 | Power outage | Planned power outage on SNI. |
| 134 | FORT PIERCE, FL | 2009-08-04 | Replaced buoy | - |
| 150 | MASONBORO INLET, ILM2, NC | 2009-07-31 | Replaced buoy | - |
| 150 | MASONBORO INLET, ILM2, NC | 2009-07-27 | Recovered buoy | Batteries low, need replacement. |
| 155 | IMPERIAL BEACH NEARSHORE, CA | 2009-07-27 | Replaced buoy | - |