CDIP banner
CDIP banner recent historic documents
sub-menu
Documentation
 
FAQs & Summaries
Glossary
Publications
 
Introduction
  History and Funding
  Program Goals
Wave Measurement
  Wave Generation
  Wave Dynamics
  Irregular Waves
  Spectral Analysis
  Gauging Waves
  Hurricane Events
  Tsunami Events
Instrumentation
  Underwater Sensors
  Surface Buoys
  Meteorological
Data Acquisition
  System Organization
  Hardware
  Software
Data Processing
  System Organization
  Software
  Quality Control
Data Management
  Stations and Sets
  Files and Storage
CDIP Products
  Data Formats
  Web Products
  COOS Integration
  WIS
  QARTOD
  Wave Eval Tool
  Metadata
  Custom Products
  NDBC XML/NWS Format
  NDBC Dial-A-Buoy
  Access Instructions
 
Related Links
 
Toolbox Checklist For Deployment and Buoy Swap Out
* Denotes required tools. 
1) *Wrench set. Metric and Standard
a. *Ensure that you have two 3/4" wrenches
b. 10 mm wrench
c. 7/16 wrench
2) *Allen (Hex) key set - Especially 5 mm
3) *Crescent Wrenches ? Small and Large 
4) *Screwdrivers ? Flathead and Phillips ? Large, Medium, and Small
5) *Channel Lock Pliers ? Large and Small
6) *SMALL Needle Nose Pliers
7) *Electrical Tape
8) *Spare Mooring parts kept in Toolbox
	a. Extra Cotter Pins for shackles and polyterminations
	b. Extra Buoy Tophat Screws
	c. Extra termination screws and U-bolts
		i. 10 mm nuts
		ii. 7/16 nuts
	d. Extra Buoy Chain Shackles
	e. Extra Buoy Tophat Gasket
	f. Extra Triangle Mounting Hardware
		i. Bolts, Flat brackets, and Nyloc Nuts
9) Vice Grip pliers
10) Scrapers (long flat prybars)
11)  Large and Small zip ties
12)  Tape Measure
13)  Liquid Tape
14)  Shrink tube
15)  Flashlight
16)  Voltmeter 
17)  Q-tips
18)  Alcohol
19)  High Vacuum Grease
20)  Razor Blades
21)  Pencils, Pens, Sharpie markers
22) *Lifting bridal
23) *Quick release
*Note any special tools or supplies you may need if you are doing any non-standard work such as setting up a shore station.