CDIP banner
CDIP banner recent historic documents
sub-menu
Documentation
 
FAQs & Summaries
Glossary
Publications
 
Introduction
  History and Funding
  Program Goals
Wave Measurement
  Wave Generation
  Wave Dynamics
  Irregular Waves
  Spectral Analysis
  Gauging Waves
  Hurricane Events
  Tsunami Events
Instrumentation
  Underwater Sensors
  Surface Buoys
  Meteorological
Data Acquisition
  System Organization
  Hardware
  Software
Data Processing
  System Organization
  Software
  Quality Control
Data Management
  Stations and Sets
  Files and Storage
CDIP Products
  Data Formats
  Web Products
  COOS Integration
  WIS
  QARTOD
  Wave Eval Tool
  Metadata
  Custom Products
  NDBC XML/NWS Format
  NDBC Dial-A-Buoy
  Access Instructions
 
Related Links
 
Deployment Checklist:

____1)	Check buoy checklist to make sure buoy is functional and ready to be deployed

____2)	Logbook and chart of area

____3)	Buoy

____4)	Buoy Antenna (may be more than one depending on tophat configuration)

____5)	Mooring Parts: anchor chain, galvanized chain, steel ring, galvanized and stainless shackles   
	(unless swapping buoy on existing mooring)

____6)	Mooring diagram and mooring components (from bungee to the hose covered line at the top of 
	the mooring) usually 2 to 5 cans of materials.

____7)	Spare Mooring Parts: U-bolts (for poly-line terminations), cotter pins for shackles and 
	poly-line terminations, stainless steel shackles, stainless steel swivel, safety shackle, 
	steel ring, nuts for terminations

____8)	Buoy Finder  Extra AA batteries, Antenna (allows verification of HF transmissions, 
	location data and heave data in the field)

____9)	Foul Weather Gear

____10)	Gloves (2 pairs)

____11)	Toolbox  *check toolbox checklist to ensure all the proper tools are taken*

____12)	Ratchet Straps and Tie-Downs

____13)	Voltmeter

____14)	Lifting Bridle

____15)	Quick Release

____16)	Lifting Slings and Tag Lines